Is Lean Construction a way to design production systems to minimize waste of materials, time, and effort to generate the maximum amount of value?

user-image
تم إضافة السؤال من قبل Vinod Jetley , Assistant General Manager , State Bank of India
تاريخ النشر: 2014/07/17
Ashraf Al Hour
من قبل Ashraf Al Hour , Senior Projects Engineer/ Project Coordinator , LREDC

LEAN construction is a wide thinking of the maximum use of time with micro monitoring of activities processes, the use of LEAN still require having P6 or scheduling methodology , but its concerns more about how to prevent and recover delays rather raising it.

Ashraf Ali Al Hour

Rizwan Assainar
من قبل Rizwan Assainar , BIM Project Engineer , DPR Construction

I would say it isn't just a design effort. Though it plays a major role in constructability. It is a major effort from the general contractors side with the subcontractors to control the non-direct/non-value adding time. It is also important to learn the quality and downstream efforts. 