Is it better for a project Manager to focus on management and planing or to dig into technical details of the project with the technical lead ?

I mean should he challenge the tech lead and the team for the decision taken while doing the project or this will make him loose focus on his pm activities

user-image
تم إضافة السؤال من قبل Mohamed Hamdy Kamal Riad , Senior Solution Architect , IBM
تاريخ النشر: 2014/08/21
Salauddin Mohammad
من قبل Salauddin Mohammad , Sr. Manager, Software Development , Aspen Technology Inc

As long as the project is progressing smoothly as planned and there are no issues, PM should focus on his planning, and other management activities. PM should involve in technical details when there is an issue so that he can understand the problem better and should be able to make a better judgement on contingency plans needed, and can report to the issue to sponsor alongwith the proposed solution (contingency) he has. Please note that, PM should trust the tech lead however he should try to dig into more details whenever there are issues so that the situation can be in control (issue can be correctly prioritized and proper contingency and mitigation measures can be taken).. 

Mohammed Asim Nehal
من قبل Mohammed Asim Nehal , M Asim Nehal & Co , Chartered Accountants

As the job demands he should perform within the scope.  A Project Manager if hired for technical expertise then he need to dig into technicalities otherwise his job is to Lead a team to achieve the target within time and budget.

hossam azzam
من قبل hossam azzam , Fast food restaurant,s manager. , alexandria-egypt

Good question

Agreed with the answer given by

Mr.:Salauddin mohammed

100% for sure

Fredy Makram Labib
من قبل Fredy Makram Labib , R&D manager , Universal for home appliances

For project manager going through details of technical issues continuously is waste of time but in destructive decisions something he can deal with technical issues with the technical managers

Raafat Sallam
من قبل Raafat Sallam , Organizational Development and Training Consultant , Training Centers, Marketing Organizations.

The key word to answer your question is "Application area". i.e., the main role of project manager is how to manage the project through awareness of application area

Mohammad Habboub
من قبل Mohammad Habboub , ENTREPRENEUR , confidential

From my point of view, it will be better not to go through technicalities whether he is aware with it or not, unless there is a technical issue which may lead to an issue he must try to find solutions through the experts and to document this issur in leasons learned and issues log

Tanveer Qureshi
من قبل Tanveer Qureshi , Director , Qureshi Associates

The job of project manager is to manage project smoothly. The specific duties of project manager vary from industry to industry, company to company and even project to project. But there are some key responsibilities, if perform well will help successful completion of project. These are:

  • Planning
  • Organizing
  • Leading
  • Comtrolling

In addition to above, sometime project manager involves to dig technical details. Here I want to give a parctical example. I was project manager of a paper sack factory and established one production line. At the time of establishment of2nd production line, I decided to reduce cost. I arranged a meeting with Plant Manager. After meeting we concluded  that one Glue Line is sufficient to run both production lines and we saved at least half million euroes.  

 

Mohmad Moin Sodagar
من قبل Mohmad Moin Sodagar , RELATIONSHIP OFFICER - SME , DUNIA FINANCE LLC

If its about project manager, I would go for management and planning of the project. If the well planned and maneged there is no need to get digged into technical details. If so, he can delegate to project executive. 

Abdul-Hameed Deeb Al-Sawadi
من قبل Abdul-Hameed Deeb Al-Sawadi , IT Manager , Masaneed Commercial Group (MCG)

For me as a PM, I would go for project management and planning in the first place. If every thing is going OK, there is no need to dig into technical details.

Hany Omar
من قبل Hany Omar , Chief Performance Officer , IntelliSC

My preference: that the PM focus on the project management tasks - which are a LOT - but have a high-level understanding of the technical side of the project.  The PM should manage the technical team leader who would be responsible for the technical details

OSAMA Baioumy
من قبل OSAMA Baioumy , Sr. Project Manager , Well Reputed Multinational Group

AS per PMI- It is better for a project Manager to focus on management and planing nor to dig into technical details of the project with the technical lead