ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

What are the 'Gaps' referred to in ALM?

user-image
تم إضافة السؤال من قبل Vinod Jetley , Assistant General Manager , State Bank of India
تاريخ النشر: 2014/08/26
RAJU MOHAN
من قبل RAJU MOHAN , Risk Manager , Canara Bank

Assets and Liabilities are put into different time buckets based on several factors. Gaps are the difference between the total of assets and liabilities in different time buckets. It is required for various MIS purpose especially liquidity management.

 

In the context of Indian Banks , the mandatory requirement for the Gap management in the first four time buckets i,e (1 day,2-7 days,8-14 days,15-28 days ) are5%,10%,15%,20% respectively ( maximum gap )

مستخدم محذوف‎
من قبل مستخدم محذوف‎

The variance between the bank assets & liabilities tenors and deposits' volume

المزيد من الأسئلة المماثلة