ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

You are a project manager for an agricultural supply company. You have interviewed stakeholders and gathered requirements.

Which of the following is true regarding the process this question refers to? A. The requirements document lists the requirements and describes how they will be analyzed, documented, and managed throughout the project. B. Requirements documentation consist of formal, complex documents that include elements such as the business need of the project, functional requirements, nonfunctional requirements, impacts to others inside and outside the organization, and requirements assumptions and constraints. C. The requirements documentation details the work required to create the deliverables of the project, including deliverables description, product acceptance criteria, exclusions from requirements, and requirements assumptions and constraints. D. The requirements traceability matrix ties requirements to project objectives, business needs, WBS deliverables, product design, test strategies, and high‐level requirements and traces them through to project completion.

user-image
تم إضافة السؤال من قبل Sawla Varouqa , PCS Manager & MEL Officer for USAID/Jordan Water Engineering Services (WES) 10 M USD. , SAJDI – Consulting Engineering Center (CEC).
تاريخ النشر: 2014/08/26
Sajjad Ali
من قبل Sajjad Ali , Manager Accounts , Jubilee General Insurance Co Ltd (Formerly New Jubilee Insurance Co Ltd)

Credit balance means it is receivable for the party has the credit balance in this case there are scenarios either the business is still going on between the sell & buyer or it is stopped

Aziz Ali
من قبل Aziz Ali , EHS Manager , Alstom Dubai Tram Depot

i will go with the option C with the specifics of Agri based projects considering scope and objectives

مستخدم محذوف‎
من قبل مستخدم محذوف‎

I agree with colleagues

The first answer

 

Thank you

Muhammad Hamid Munir PMP
من قبل Muhammad Hamid Munir PMP , Program Manager , Ericsson AB

The Option A suits this situation

But bear in mind that at this level you will get high level business requirement. 

Mohammed Salim Syed
من قبل Mohammed Salim Syed , Business Information Manager , muvi Cinemas Co.

A. The requirements document lists the requirements and describes how they will be analyzed, documented, and managed throughout the project.