To keep production at maximum, in addition of raw material which spare part must available?

user-image
تم إضافة السؤال من قبل Rami Assaf , loading and Storage Operations Supervisor , Arab Potash Company
تاريخ النشر: 2014/09/03
YASSIEN HUSSIEN
من قبل YASSIEN HUSSIEN , General Manager , Alrowad Plastic pipes

Every machine has a specified schedule for maintenace if respected and replaced in the right time you can run the machine in max efficiency but care that the maximum o/p of the machine can obtained in some special conditions like type of recommended raw materials and the utilization of machine capacity

samer maher
من قبل samer maher , Senior Operations Manager , El Badry

I support Mr.Yassin in his answer