How can you monitor the latest revision number of Engineering documents?

user-image
تم إضافة السؤال من قبل مستخدم محذوف‎
تاريخ النشر: 2014/09/03
hisham abu dagga
من قبل hisham abu dagga , Project Manager / مدير مشاريع , مؤسسة عبدالكريم العواض للمقاولات

Thanks for invitation

 

Action surveillance schemes Control Chart-

 

Surveillance scheme is a table or a map, indicating the chronological order determines whether a variation Screened in abnormal condition.

 

 

The scheme includes a viewing on the medial line and supply lines for the limits of lower and upper and two lines help to see if it should be initiated to resolve the problem if some variation came from a binomial. The samples that are between the two lines are the reasons commonplace As if some samples outside it for reasons other than common and requires intervention in the making process between the border and close to the average. When analyzing surveillance scheme, there will be a

conclusion if science was out of control Out of Control Under Control or under control

 

Measuring variables that if he got any change out the allowable limits for the manager or engineer or observer will know the size of the change in numbers, and also work on the drafting of specifications and border Allowed Extensions

Mahmoud Zaher Tarakji
من قبل Mahmoud Zaher Tarakji , مدير , أوال جاليري

I agree with Mr Hisham Abu Dagaa

Luqman Akintayo
من قبل Luqman Akintayo , Building Engineer , Standard Metallurgic Company (S.M.C

efficiently