أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
<p>In an Activity Based Costing System, which one of the following is the most appropriate cost driver for allocation of depreciation on plant and machinery to specific products :</p> <p> </p> <p>a. Machine Hours</p> <p>b. Labour Hours</p> <p>c. Material Usage</p> <p>d. Number of Setup.</p>
a. machine hours
The Correct option is D) The Number of Set Up
THE ANSWER IS A.. Machine Hours
A. Machine Hours (the hours the machines are operated)