<p style="text-align:left;"><span>Schedule production based on capacity planning</span><span>.</span><span> -</span></p> <p style="text-align:left;"><span><span> </span></span><span>Plan maintenance activity based on an analysis of equipment repair work orders</span><span>.</span><span> -</span></p> <p style="text-align:left;"><span><span> </span></span><span>Preauthorize equipment maintenance and overtime pay</span><span>.</span><span> -</span></p> <p style="text-align:left;"><span><span> </span></span><span>Establish a preventive maintenance program for all production equipment</span><span>.</span><span> -</span></p>
The correct answer Establish a preventive maintenance program for all production equipment. -
A preventive maintenance program will reduce equipment breakdowns and repairs
Establish a preventive maintenance program for all production equipment.
I am Always with this method the preventive before the breakdown accur to avoid any problem.
Establish a preventive maintenance program for all production equipment - is the answer
because
A preventive maintenance program will reduce equipment breakdowns and repairs
Establish maintenance program for all production equipment