ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

Slope of the NPV profile for Project 1 when compared to the slope of the NPV profile for Project 2 is most likely: A. equal. B. flatter. C. steeper

An analyst is developing net present value (NPV) profiles for two investment projects. The only difference between the two projects is that Project1 is expected to receive larger cash flows early in the life of the project, while Project2 is expected to receive larger cash flows late in the life of the project. The slope of the NPV profile for Project1 when compared to the slope of the NPV profile for Project2 is most likely: A. equal. B. flatter. C. steeper.

user-image
تم إضافة السؤال من قبل Vinod Jetley , Assistant General Manager , State Bank of India
تاريخ النشر: 2014/10/23
المزيد من الأسئلة المماثلة