أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
by analyzing the proceeder of the changes and making sure that change does do not have impact on the scope, budget or schedule or will not result in an increase in risk for the project and get apporve by the maningment and managing on both sides, the technical side and the people side