ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

If a resource required by the project is under deadlock condition, what will be your strategy to solve the issue ?

user-image
تم إضافة السؤال من قبل Muhammad Usman Tariq , Visiting Faculty , National University of Science and Technology
تاريخ النشر: 2014/10/29
Sasa Stavric
من قبل Sasa Stavric , Engineer Techinician , Kombinat

find the problem,and then take steps to achieve fast setting

Abdulgafar Mohammed
من قبل Abdulgafar Mohammed , Project Manager/Fire Inspector , Chronicle International

If the resource is critical, then we might need to have a meeting with the client. If it is a human resource situation, i would suggest out-sourcing. If it is a material resource or any other, then we might have to adjust the schedule and other elements accordingly.

sajid m s
من قبل sajid m s , PROJECT ENGINEER , Inmarco FZC

Check whether this deadlock condition resource is critical in the project. If yes, and it cannot be recovered from the current status without irrecoverable losses, entrust the succession resource on the job immediately.Else, take it easy, manage with other resources, taking care not to over allocate or scheduling them.