ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

How much time your Manager Spent on CAD Software: Autocad, SolidWorks, CATIA, or any other tool?

<p>Ex:1. Daily upto2-3 Hrs; remaining for client &amp; vendor meetings;              </p> <p>            repsonding to emails etc</p> <p> </p> <p>       2.He just guides &amp; do correction, not using the software at all.</p> <p> </p> <p>       3. He is using full time along with the team.</p> <p> </p>

user-image
تم إضافة السؤال من قبل Eby Mathai , Engineering Manager , KeM Engineering Services LLC
تاريخ النشر: 2014/10/30
gowrishankar ganesan
من قبل gowrishankar ganesan , service engineer , shahig company

he just check and correct process 

georgei assi
من قبل georgei assi , مدير حسابات , المجموعة السورية

       2.He just guides & do correction, not using the software at all.

 

Raja Khader Mohideen R
من قبل Raja Khader Mohideen R , Design Engineer , Autoone Engineering Services Pvt. Ltd.

He verifies the final drawing alone

SAFREENA NASRIN
من قبل SAFREENA NASRIN , Architectural Draftsman , Establishment: Design Attitude

He spent the for checking the CAD file

Muhammad Shakeel
من قبل Muhammad Shakeel , CAD Design Manager , M/S zeeruk Intl.

He Just check and Guide us, remaining of Time he attend the meetings with clients and vendor also. some of the days he spent whole the day using software to preparing the new design and If there is some needs to achieve the targets he is helping us and also giving Moral supports.

Agosh Kumar
من قبل Agosh Kumar , Sr. Executive. Engineer , Ashok Leyland Bhandar

Most of the time my manger spend his time on outlook and approx he spent his 20% time on CAD software to check others work and to find a solution. 

karthik rethinam
من قبل karthik rethinam , Design Engineer , Albilad Fire Fighting Systems Pvt Ltd.,

Our manager spent on every day 8 hours

Mohammad Hasan
من قبل Mohammad Hasan , LASER CNC OPERATOR , WORKSHOP

A little time .. because the design team is the one who spends a long time on these programs, but my manager at work checks only the files that have been designed

المزيد من الأسئلة المماثلة