ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

How can you define the Critical Path in Primavera?

user-image
تم إضافة السؤال من قبل ABDULAZIZ AREKAT , Regional Projects Manager , Dawahi Alkudus Contracting
تاريخ النشر: 2014/12/03
Kathy Castle
من قبل Kathy Castle , Project Controls Specialist /Forensic Claim Analyst /Consultant , Freelance

According to The Project Management Body of Knowledge (PMBOK), The Critical Path is “the sequence of scheduled activities that determines the duration of the project. Primavera P6 Critical Path Calculations.

jillan ksr
من قبل jillan ksr , Principal Advisor-Planning and Freelance Trainer , Navig Solution Private Limited

Here is an excellent video that explain CPM in primavera.

https://youtu.be/TVo2e4Ru2Rs

when you do a project, CPM help you to find out the project total duration, number of day that you can delay each activity and so on. this video is worth a watch

tutomaash

مستخدم محذوف‎
من قبل مستخدم محذوف‎

CRITICAL PATH is the longest duration path through a network diagram and determines the shortest time to complete the project. The activities within this path have the least amount of total float, or zero total float.

 

in PRIMAVERA, check out the Gantt chart. The critical path activities are usually in RED. You can use Filter to show only the critical activities.

Click on Filter > Customize... and in the filter pop-up window, check the box of either Critical or Longest Path.

Jalaludeen Mohammed Ayub
من قبل Jalaludeen Mohammed Ayub , Planning Manager , BECHTEL

Critical path is the longest chain of activities connecting starting & end activities of project with minimum or zero  total float, any delay on critical path will delay the overall completion of project.

Mohammad Asif
من قبل Mohammad Asif , Technical Support Engineer , Lisec Automation

Critical path is the set of activities that starts and end on time to ensure that the project completes on given schedule.

المزيد من الأسئلة المماثلة