PLC - Programmable logic controller. Its a hardware, which is directly in contact with field instruments. it works according to the logic stored in PLC Memory.
SCADA - Supervisory control and data acquisition. Its a software, which shows the output and feedback in Visual manner, that PLC can't do.
PLC is a Programmable Logic Controller. A programmer written program as per client requirement, which relates to inputs / outputs of PLC. Outputs can activate the field equipment(Motor, Solenoid valve etc.) and Inputs can sense field equipment ( Limit Switch, Zero Speed Sensor etc.).
SCADA is Supervisory control and data acquisition. A programmer design the animation as per PLC programming and field equipment position, then make communication between SCADA and PLC. After successful communication between SCADA and PLC we Can Visualize the operation which is happen in field from Control Room.
PLC is a programmable Logic controller which is used mainly for interlocking different equipments
SCADA(supervisory control and data acquisition system. It consists of many remote terminals units for collection of data (field),that is being connected with master station through any communication system, having main task of collection of accurate data and controlling of process for smooth operation.