أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
The first one is the distance of transmission line from source to destiny
The power capacity to be transmitted, environmental and geographical conditions.
Expected power upgrading nodes substations and other conditions.