<p><em><strong>The elimination of which internal control is usually acceptable with a JIT system?</strong></em></p> <p><em><strong> A. Preparation of hard copy receiving reports.</strong></em></p> <p><em><strong>B. Voucher approval prior to paying accounts payable. </strong></em></p> <p><em><strong>C. Two signatures required on large checks. </strong></em></p> <p><em><strong>D. Locked doors on production areas.</strong></em></p>
correct answer is A
A. Preparation of hard copy receiving reports.
The correct option is (A)