ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

We get excavation level readings more accurate with total station, say yes or no (and give reason)?

user-image
تم إضافة السؤال من قبل Omair Abduljaleel Ali Al-Quliey , Design Engineer , Quliey Office for constructions
تاريخ النشر: 2014/12/31
Mohamed Sulaiman
من قبل Mohamed Sulaiman , Site Project Manager , Al tabarak for Engineering & Contracting company

Yes, total station has more applications and get accurate reading. But for level readings only, you can use level scale, it gives also accurate results.

Muhammad Khalil
من قبل Muhammad Khalil , Chief Engineer (Civil) , Water and Sanitation Services Mardan

Agree with the brother yaqoob and Muhammad Suleman

مستخدم محذوف‎
من قبل مستخدم محذوف‎

yes because accuracy is more

 

 

Muhammad Shakeel
من قبل Muhammad Shakeel , CAD Design Manager , M/S zeeruk Intl.

yes use of Total Station is more accurate and reliable for setting out and Excavation.

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟