Full professional service 

 

A full professional service by a Consulting Engineer to a Client for a project comprises five main stages, as follows:

1. investigation and report 

2. detailed design and preparation of contract documents 

3. arranging a contract 

4. services-during-construction 

5. acceptance of Works, commissioning of systems, and resolution of final account.

 

In performing services, the principal duty of a Consulting Engineer is to render faithfully those which are entrusted to him, and the remuneration he receives is solely that paid by his Client.

 

 

Partial service 

 

A Consulting Engineer who undertakes only some of the services comprised in a full professional service, is not in a position to take responsibility for the performance or consequence of those which are not entrusted to him. 

 

 

Payment for services-during-construction 

 

Payment for services-during-construction should be based on the duration and scale of the project, except for payment for resident site staff. That should be based on the staff numbers, categories and duration that in the event prove to be required. Although the services of the Consulting Engineer may include his recommendation as to the numbers and categories of resident site staff required for the proper discharge of resident services-during-construction, and the duration for which they are required, nevertheless, the actual requirements will depend partly on considerations outside his control, such as the performance of the Contractor, the time taken to complete the Works, any particular requirements of the Client, and specific details of the construction contract as finally adopted.

 

Therefore, FIDIC recommends as follows:

 

1. The Consulting Engineer should recommend to his Client the advantages of a full professional service providing continuity from inception to completion of a project.

 

If the Client does not accept this recommendation, the Consulting Engineer should analyse and agree with his Client, before accepting an appointment for partial services, on the allocation of responsibilities for the different services respectively, and the procedures to be adopted for any independent checking or repetition of previous services that may be required.

 

 

2. The Consulting Engineer should recommend to his Client the advantages of the Consulting Engineer undertaking entire service-during-construction with delegated authority to exercise comprehensive powers under the construction contract, as the agent of the Client, and authority to act as independent arbiter on matters properly referred to the Consulting Engineer for decision under the construction contract.

 

If the Client does not accept this recommendation, the Consulting Engineer should analyse and agree with his Client, before proceeding with the services, on the allocation of responsibilities for the various duties respectively, between the Client and the Consulting Engineer, between the Client and the Contractor, and between the Consulting Engineer and the Contractor, all of which should be recorded in writing.

 

 

3. Remuneration for services-during-construction should comprise two main parts: 

     1. payment for all services other than resident site staff, on the basis of a retainer per month, or on the basis of a  percentage of the cost of the Work

 

and

 

     2. payment for resident site staff at man-month rates plus mobilisation payments.

 

In addition, payments to the Consulting Engineer should include reimbursement of out-of-pocket expenses and other disbursements incurred by the Consulting Engineer in connection with the services, unless they are included by agreement in the above payments.

 

The financial arrangements should also provide for revisions, from time to time, of the retainer, man-month and mobilisation rates, depending on the duration of the required services, or if they should be required after the originally intended completion date

Alex Al Yazouri
من قبل Alex Al Yazouri , General Manager , Al Mushref Cooperative Society

A full professional service by a Consulting Engineer to a Client for a project comprises five main stages, as follows:

1. investigation, monitoring, report and recommendation 

2. detailed design and preparation of contract documents

3. arranging a contract

4. services-during-construction

5. acceptance of Works, commissioning of systems, and resolution of final account.

 

Elke Woofter
من قبل Elke Woofter , Project Assistant , American Technical Associates

I agree with Mr. Vinod Jetley and Mr. Alex Al Yazoouri

Muhammad Shakeel
من قبل Muhammad Shakeel , CAD Design Manager , M/S zeeruk Intl.

Very Comprehensive Answer for Mr. Jetley and solid brief from Mr. Alex.

Wolf Klaas Kinsbergen
من قبل Wolf Klaas Kinsbergen , Managing Director, Designer , ingenieursbureau KB International NV

His/her role:  you should be able to consult with him/her at any time about there discipline.

USAMA YOSSRY AHMED GENDIA
من قبل USAMA YOSSRY AHMED GENDIA , Resident Engineer , ACE ARAB CONSULANT ENGINEER - MOHARM BAKHOOM

Mr. Vinod Jetley

 

 Vinod Jetley

Vinod Jetley                                                

 

Excellent answer and agreed with you

hareesh andravalappil
من قبل hareesh andravalappil , ARCHITECTURAL DRAFTSMAN , ARCHONS

IF ANY COMPLICATION HAVE IN THE SITE, THAT WILL HAVE SORT OUT THE CONSULTING ENGINEER AND HE IS THE PERSON TO CHANGE IN THE DRAWINGS AS REQUIRED IN THE SITE.

Reynaldo Fermin
من قبل Reynaldo Fermin , site architect/3d designer,supervision,detailing , high stone builders

The role of engineer at the site is check the strengths of every ftgs column beam slab base on the construction plan even the rebars are follows the spacing of stirrup the column is in the plumpness the width of column and thickness of beam and slab and must be base on construction plan issue if there is any discrepancy must be tackled in meeting .

Mohamed Batran
من قبل Mohamed Batran , PROJECTS MANAGER , MBA, PMP , Alrajhi Ekhwan Group Co.

the contractor execute according documents and specifications.

The consulting engineer are only asked information of the contractor of how do they implement the project, documentation, report, client and contractors coordination.

المزيد من الأسئلة المماثلة