أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
<p><strong>A) Will include quantitative criteria </strong><strong>B) Will include qualitative criteria </strong><strong>C) Each criterion is assigned a weight </strong><strong>D) Projects with higher scores are considered more desirable </strong><strong>E) All of the above are true</strong></p>
E) All of the above are true
After investigating all the answers, yes E.
Thanks En.ALex..
"E"
E. All of the above are true is the correct answer.
Choice (E)
All the answers are true (E)
B) Will include qualitative criteria
Only quantitative criteria will be considered for which each criteria will be assigned a weight which is used to calculate the total score of a project.
a, b, d, e
Yes the correct answer is....................
E) All of the above are true