ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

Which of the following Project Scope Management processes involves subdividing the major project deliverables into smaller?

<p><strong>more manageable components?</strong></p> <p><strong>A. Plan Scope Management </strong></p> <p><strong>B. Define Scope </strong></p> <p><strong>C. Validate Scope </strong></p> <p><strong>D. Control Scope </strong></p> <p><strong>E. Create WBS</strong></p>

user-image
تم إضافة السؤال من قبل Alex Al Yazouri , General Manager , Al Mushref Cooperative Society
تاريخ النشر: 2015/01/08
Divyesh Patel
من قبل Divyesh Patel , Assistant Professional Officer- Treasury , City Of Cape Town

E. Create WBS

Aziz Mahmoud
من قبل Aziz Mahmoud

WBS....it provides a structured vision tgat guides tge project team exactly what iscto be delivered.

VENKITARAMAN KRISHNA MOORTHY VRINDAVAN
من قبل VENKITARAMAN KRISHNA MOORTHY VRINDAVAN , Project Execution Manager & Accounts Manager , ALI INTERNATIONAL TRADING EST.

Create WBS---A deliverable-oriented hierarchical decomposition of the work to be executed by the project team to accomplish the project objectives and create the required deliverable

Bilal Safdar
من قبل Bilal Safdar , Project Civil Engineer , Bulleh Shah Packaging (Pvt) Ltd (Stora Enso & Packages Ltd JV)

(E)- WBS

Alex Al Yazouri
من قبل Alex Al Yazouri , General Manager , Al Mushref Cooperative Society

E. Create WBS

A work breakdown structure (WBS), in project management and systems engineering, is a deliverable-oriented decomposition of a project into smaller components.

 

Ibrahim Hussein Mayaleh
من قبل Ibrahim Hussein Mayaleh , Sales & Business Consultant and Trainer , Self-employed

It is the Work Breakdown Structure that is used in both Project Management as well as Systems Engineering. (E)

Abiola Adebisi
من قبل Abiola Adebisi , Real Property Project Officer , Government of Canada

create Work Breakdown Structure

Elke Woofter
من قبل Elke Woofter , Project Assistant , American Technical Associates

E) Create WBS is my answer

Mahmoud Awwad
من قبل Mahmoud Awwad , Project Manager , Gulf Engineering and Industrial Consultancy

E. Create WBS is the correct answer

Chayan Purkayastha
من قبل Chayan Purkayastha , Project Manager , CH2M Hill

E-Create WBS.  Work breakdown structure splits the activities.

المزيد من الأسئلة المماثلة