أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
<p> </p> <p>The Management Information system (MIS) structure with one main computer system is called a</p> <p>A. hierarchical MIS structure</p> <p>B. distributed MIS structure</p> <p>C. centralized MIS structure</p> <p>D. decentralized MIS structure</p> <p>E. None of the above</p>
Answer C is correct, while MIS even centralised can be hierarchical so answer A is also correct.
WBS is a part of project Schedule. if one have break up of activities then he/she can estimate time of completion of that activities and make project Schedule applicable
shold we have a answer is c
Answer is C. Centralized MIS Structure
The answer should be (C)
C. centralized MIS structure