What's Flow Control in Cost and Control?

user-image
تم إضافة السؤال من قبل Alex Al Yazouri , General Manager , Al Mushref Cooperative Society
تاريخ النشر: 2015/01/27
Alex Al Yazouri
من قبل Alex Al Yazouri , General Manager , Al Mushref Cooperative Society

Flow control, also called optimized production technology, focuses on the efficient flow of material through the production process. The philosophy of flow control focuses on bottlenecks.

For example, an owner using flow control will not buy a machine capable of1,000 units an hour if supply is only500 units. Examine systems and determine where lowest flow is experienced, then address that point and make sure it operates at full capacity. Flow control applies well where maximum productivity is required.

Vinod Jetley
من قبل Vinod Jetley , Assistant General Manager , State Bank of India

Managing cash flow control in construction projects is an important aspect of project management’s plan execution. Cost and funding problems usually arise from a chain of activities. To ensure the project’s continuity, this should be recognized by a system of procedures that recognizes the existence of deviations and their extent.

A set of project control processes for managing cash flow in construction projects is not intended for cost-savings objectives because this aspect should have been achieved at the planning stage. The focus of cash flow control is to fulfill what was originally planned because major changes if any, have already been anticipated and covered during the formulation of said plan.

مستخدم محذوف‎
من قبل مستخدم محذوف‎

Flow Control in Cost and Control

Adjust production with market requirements

 

And control the availability of the item appropriately

Elke Woofter
من قبل Elke Woofter , Project Assistant , American Technical Associates

 

The process or activity on controlling costs associated with an activity, process, or company.

Cost control typically includes (1) investigative procedures to detect variance of actual costs from budgeted costs, (2) diagnostic procedures to ascertain the cause(s) of variance, and (3) corrective procedures to effect realignment between actual and budgeted costs.

 

In this work we take a fresh look at the problem of flow control in multi-sender multi-group ..... Resource opportunity cost is defined based on the uti- lization of the .

مستخدم محذوف‎
من قبل مستخدم محذوف‎

1. structure of the Division of work breakdown structure WBS2-OBS3-project management costing and monitoring actual cost must monitor the various cost components (employment-materials-equipment-subcontractors) for each account costs according to print forms used to collect the actual cost.

The objective of cost control they actually follow what had been spent compared to what was planned to be spent and the distractions so you can take appropriate action in a timely and cost control is a continuous process and within the scope of control of the project by the project manager and is responsible for the implementation or supervision.

Basit Ali
من قبل Basit Ali , Director of Engineering , Laverda Suites & Villas / Blue Bay Resorts

Flow control, also called optimized production technology, focuses on the efficient flow of material through the production process. The philosophy of flow control focuses on bottlenecks.

مستخدم محذوف‎
من قبل مستخدم محذوف‎

Good Q. and best answers 

I agreed with them 

Wolf Klaas Kinsbergen
من قبل Wolf Klaas Kinsbergen , Managing Director, Designer , ingenieursbureau KB International NV

Flow control is the management of data flow between computers or devices or between nodes in a network so that the data can be handled at an efficient pace. Too much data arriving before a device can handle it causes data overflow, meaning the data is either lost or must be retransmitted.

So replace the word data by money:

Flow control is the management of money flow between parties in a project so that the money can be handled at an efficient pace. Too much money arriving before the project can handle it causes money overflow, meaning the money is either lost or must be retransmitted.

Divyesh Patel
من قبل Divyesh Patel , Assistant Professional Officer- Treasury , City Of Cape Town

I agree with all answers given by experts.

LABIB KOOLI
من قبل LABIB KOOLI , Director of the Sectoral Center for Training in Hotel Technologies at Southern Hammamet , Tunisian Vocational Training Agency (ATFP)

In Manufacturings the flow control deals with the most efficient machines dispositions and arragement that is at least as said by Alex avoiding any possible bottlenecks and offering the 

production optimization.

As an example in the Confection industry, for each new product a new machines disposition 

is a must.

 

 