ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

At which stage of Inspection, is the opportunity to reduce waste the maximum?

 

a. At the Finished Goods stage before it is shiiped to customers

b. At the incoming material stage before the material is issues to production

c. During Work-In-Progress on the shopfloor

d. At customer place, after the finished goods are sold

user-image
تم إضافة السؤال من قبل Wasi Rahman Sheikh , Warehouse Supervisor , AL MUTLAQ FURNITURE MFG
تاريخ النشر: 2015/02/09
WAQAR SIDDIQI
من قبل WAQAR SIDDIQI

b. At the incoming material stage before the material is issues to production

VENKITARAMAN KRISHNA MOORTHY VRINDAVAN
من قبل VENKITARAMAN KRISHNA MOORTHY VRINDAVAN , Project Execution Manager & Accounts Manager , ALI INTERNATIONAL TRADING EST.

>>>More convenient for checking more precisely.

c. During Work-In-Progress on the shop floor.

 

>>>More convenient to reduce cost also at the time of receiving materials that  facilitate immediate  returns.

b. At the incoming material stage before the material is issues to production

 

مستخدم محذوف‎
من قبل مستخدم محذوف‎

                                                                                                                      

all -   a&b&c&D

 

 ........................................................

Mohammed Fathe  Shaheem
من قبل Mohammed Fathe Shaheem , Operation Executive , Arabian Construction Company

B and C is the answer as it can be considered as internal quality defect and can be much saved maximum wastage where as compared to external which is the stage where we can say it is at distributor and customer end 

which will give the quality defect cost maximum and reliability will be lost 

Ronaldo Alcoriza
من قبل Ronaldo Alcoriza , Project Site Coordinator , Desert Landscape Company

By checking carefully project site requirement before issued to particular production area

 

Lester Barile
من قبل Lester Barile , Warehouse Supervisor , Renewable Products Group

best to maximize elimination of waste is

B.) At the incoming material stage before the material is issues to production

Md. Hasan
من قبل Md. Hasan , Logistics Manager , Action Contre La Faim

planning stage of production before the materials go under each production

Ammar Siddiqui
من قبل Ammar Siddiqui , Inventory Controller , Lucky Text Pakistan (PVT) Ltd

 During Work-In-Progress on the shopfloor

Imran Ahmed Mirza
من قبل Imran Ahmed Mirza , Accounts Supervisor , Value Added Services Corp. client at Jang Group of Newspapers

The correct answer is Option

c. During Work-In-Progress on the shopfloor

Fakhruddin Doodhwala
من قبل Fakhruddin Doodhwala , Logistics / Warehouse Supervisor , Al Shuja Trading Co.

Option B at the time of receiving materials and then Option C during work in progress.

 

if waste is detected and rectified during these2 stages, the other two wont be required.

المزيد من الأسئلة المماثلة