أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
It is a push system, so option2).
As orders are secured, only then does the system prompt to plan production and ordering production materials. JIT only works if materials are able to be sourced and delivered within very short time.