ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

Manufacturing resources planning is known as MRP-II

1) TRUE

2) FALSE

user-image
تم إضافة السؤال من قبل Wasi Rahman Sheikh , WAREHOUSE SUPERVISOR , AL MUTLAQ FURNITURE MFG
تاريخ النشر: 2015/03/19
Jersh On Repolidon
من قبل Jersh On Repolidon , Spare Parts Control , Al Masaood Automoiles

The correct answer is true.

Ani Kuriakose
من قبل Ani Kuriakose , Managing Partner – SCM , A. A. Associates

TRUE Originally MRP was Material requirements Planning was developed in response to the Toyota manufacturing process. MRP later evolved into Manufacturing Requirements Planning MRP-II to include concepts like capacity planning, master scheduling.

The basic idea of MRP being to lower inventory levels and costs without disrupting manufacturing operations by addressing three basic questions

what is required ?

when is it required?

how much is required?

The latest iteration of MRP is Demand driven MRP

Emad Mohammed said abdalla
من قبل Emad Mohammed said abdalla , ERP & IT Software, operation general manager . , AL DOHA Company

>>>>>>> My answer will be TRUE..

Wasi Rahman Sheikh
من قبل Wasi Rahman Sheikh , WAREHOUSE SUPERVISOR , AL MUTLAQ FURNITURE MFG

My answer will be TRUE <<<<<<<<<<<<<<<<<<<<<<<<<

المزيد من الأسئلة المماثلة