ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

If Scope of the project has creeped , this index to what ?

user-image
تم إضافة السؤال من قبل مستخدم محذوف‎
تاريخ النشر: 2015/04/07
Omair Abduljaleel Ali Al-Quliey
من قبل Omair Abduljaleel Ali Al-Quliey , Design Engineer , Quliey Office for constructions

Thank you for invitation..

I'm with an answer of Mr.Rami khatib .

ahmed shehab
من قبل ahmed shehab , site engineer , DHA Consulting & Engineering Design

Thank you for the invitation

All the answers are excellent

Alex Al Yazouri
من قبل Alex Al Yazouri , General Manager , Al Mushref Cooperative Society

 The requirements stability index "RSI", are sometimes advocated.

Elke Woofter
من قبل Elke Woofter , Project Assistant , American Technical Associates

I am not familiar with this term .........

Rami khatib
من قبل Rami khatib , Freelancer , Project Management Consultancy

When new features are added to product designs that have already been approved, without providing equivalent increases in budget, time and/or resources

Muhammad Shakeel
من قبل Muhammad Shakeel , CAD Design Manager , M/S zeeruk Intl.

Thanks for Invitation, No any experience about this so Endorse the Experts answer.

In simple words, If scope of the project has creeped, this indicates that the project will be in trouble due to a lack of deploying a well defined project change management system deal with processing any approval or rejection requests.

Adrian Lamond
من قبل Adrian Lamond , Group Technical Manager , Sanipex Group

Scope Creep is typically the result of a poorly defined project. If the starting parameters are incomplete or poorly defined then there is usually way to avoid scope creep.

 

The problem is that the scope is typically defined by the client and the creep is picked up by the contractor. This invariably causes delays that both sides blame on each other.

 

However if you manage the scope creep correctly and clearly define the sections outside of the original parameters the delays can be contained within the creep only and not the whole project as typically happens. 

Clodelio Delfino
من قبل Clodelio Delfino , Managing Consultant , Startup Company

If the scope has creeped it means that the project is at big risk because it started without a clear or proper scope...it's a domino effect eventually.

Vinod Jetley
من قبل Vinod Jetley , Assistant General Manager , State Bank of India

Feature creep (sometimes known as requirements creep or scope creep) is a tendency for product or project requirements to increase during development beyond those originally foreseen. Feature creep may be driven by a client's growing "wish list" or by developers themselves as they see opportunity for improving the product. To control feature creep, project management tools, such as the requirements stability index (RSI), are sometimes advocated.

Syed Shan Haider
من قبل Syed Shan Haider , Senior Draftsman , Al Marwan General Contracting Company

Thanks for invitation I am agree with Mr Ayoub.

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟