Which of the following decision-making techniques can help solve the problem?

Quantitative techniques are very useful in making decisions under conditions of varying degrees of uncertainty. Torque Engineering Co. Ltd. faces the problem of allocating resources to its newly set up hydraulic pumps division.

 

 

(a) Linear programming (b) Decision tree (c) Simulation  (d) Waiting-line method  (e) Game theory. 

user-image
تم إضافة السؤال من قبل Vinod Jetley , Assistant General Manager , State Bank of India
تاريخ النشر: 2015/04/17
Vinod Jetley
من قبل Vinod Jetley , Assistant General Manager , State Bank of India

(a)

Linear programming is a mathematical technique used in optimum allocation of resources in the organization. Decision tree is a graphical method for identifying alternative actions, estimating probabilities, and indicating the resulting expected pay-off. Simulation is the technique of developing a model that represents a real or existing system for solving complex problems that cannot be readily solved by other techniques. Waiting-line or queuing model is a mathematical model that describes the operating characteristics of queuing situations, in which service is provided to persons or units waiting in line. Game theory is a technique for determining the strategy that is likely to produce maximum profits in a competitive situation.

Almutaz Bakry Sidahmed
من قبل Almutaz Bakry Sidahmed , Internal Audit Manager , Banan real estate

Answer (a) linear programming, as it is usefull to choice the optimum solution among other alternatives.

Salvatore Augello
من قبل Salvatore Augello , owner , A.S. Trade & Consult

answer A _°°°°°°°°°°°°°°°°°°°°°

مستخدم محذوف‎
من قبل مستخدم محذوف‎

With colleagues

 

(a) Linear programming

Nasir Hussain
من قبل Nasir Hussain , Sales And Marketing Manager , Pakistan Pharmaceutical Products Pvt. Ltd.

(a) Linear programming............... . . . .

Wasi Rahman Sheikh
من قبل Wasi Rahman Sheikh , Warehouse Supervisor , AL MUTLAQ FURNITURE MFG

Agree with Mr. Vinod answer <<<<<<<<<<<<<

Mohammed Fathe  Shaheem
من قبل Mohammed Fathe Shaheem , Operation Executive , Arabian Construction Company

agreed with My Expert Mr. VJ.................................................

Bello Abubakar
من قبل Bello Abubakar , Cinema 4D Render/Sketch UP, AutoCAD, ArchiCAD and Revit Specialist , Federal Housing Authority

Following my Expert, RAHMAN WASI

مستخدم محذوف‎
من قبل مستخدم محذوف‎

Agree with colleagues 

Option     A