أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
A- times of machine maintenance B- age of machine in production line C- production of each machine D- all answers are false
In terms of machine cost..(overhead costs) the no of hours the machine was used is in my opinion the best way to allocate machine maintenance costs.(ABC Costing).
Option B is also a good base to take to allocate maintenance costs.