What is the mean of "cost to cost method" in measure cost in construction project ?

user-image
تم إضافة السؤال من قبل Zaher Samir Awad , Assistant General Manager (AGM) , Project Construction & Engineering System (PROCES)
تاريخ النشر: 2015/05/17
Mazharuddin Galdi
من قبل Mazharuddin Galdi , Auditor, Accountant and Consultant , Smitha Sailesh and Company

The cost to cost method is used by project accountants to determine the percentage of completion of a project, and therefore the amount of revenue that can be recognized. It is an underlying component of the percentage of completion method