ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

What is the hardest thing you do as a civil engineer?

user-image
تم إضافة السؤال من قبل Farah Maher , software developer , IT House Solutions
تاريخ النشر: 2015/06/10
مستخدم محذوف‎
من قبل مستخدم محذوف‎

Dealing with different kind of people and other nationalities

María Infante Chillón
من قبل María Infante Chillón , Civil Engineer , Arco Studio

Working outside (at site) in summer, specially in heat wave days and dealing with unqualified people.

Omair Abduljaleel Ali Al-Quliey
من قبل Omair Abduljaleel Ali Al-Quliey , Design Engineer , Quliey Office for constructions

................................Thanks.....................................

with answer of En.Appi Reddy Kothapally.

Usman Ahmad
من قبل Usman Ahmad , Assistant Director (Civil) , Lahore Development Authority

Surveying and leveling is the most demanding activity, at least physically, which a civil engineer has to perform.

 

ahmed shehab
من قبل ahmed shehab , site engineer , DHA Consulting & Engineering Design

What I am in the design of concrete structures for3 hours exam time

Mohamed Omar CHAIB
من قبل Mohamed Omar CHAIB , Civil Engineer , SAMSUNG C&T

casting concrete without any error and having the desired compression strength, dealing with unqualified workers and unqualified owners.

Yaqoub Alomar
من قبل Yaqoub Alomar , Civil Engineer , Al-Zubeir municipality

Working in multicultural and non-organized communities

-----------------------------------------------------------------------

Appi Reddy Kothapally
من قبل Appi Reddy Kothapally , Chief Structural Consultant , self employed

working out side on a sunny day, survey of  building/road C/L markings.

John Ignatius
من قبل John Ignatius

Implementing of safety methods with workers at risky job and their absence after the break the work will not much faster than earlier, every morning the first 4 hours out put can not get after the lunch break comparing to the morning will be half performance only can be taken out from them

Patrick Meuli
من قبل Patrick Meuli , Project Manager , Razel-Bec

To remain focused and efficient when in charge of a Routine job.

Gebremedhin Abraha
من قبل Gebremedhin Abraha , Project Manager , Grace Engineering

1. Working in harsh climate

2. Working in remote area specially long separation from family

 

المزيد من الأسئلة المماثلة