أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
Yes use MB1B command to transfer plant to plant .......... ........ ......
we can transfer material from plant to plant though sap system by using the command (mb1b) then enter material slip # , doc.header tex , movement type , plant code , reason for movement then storage location press enter and give Rcvg SLoc.
We have to use MB1B (Transfer Posting) for transferring posting
There are1 step and two step procedure for stock transfer.
In1 step the stock removal and stock posting will be done by using1 movement type.
In2 step procedure,stock removal and stock posting will be done by using2 movement types.
Before doing MB1b make sure that the material is available in both the plants