ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

What Is difference between budget & estimate?

user-image
تم إضافة السؤال من قبل Sandeep Amrutbhai haribhai kachhiya , Assistant Manager , SHIMIZU CORPORATION INDIA PVT. LTD
تاريخ النشر: 2015/08/12
Vinothkumar Selvaraj
من قبل Vinothkumar Selvaraj , Estimation Engineer , Desert Landscape Co LLC

Budget is basic cost approximate

Estimation is detailed cost to excute

 

moinakhtar abdul
من قبل moinakhtar abdul , Civil engineer QS , Tatweer Buildings Company

Estimation is basic step for counting work as per CPM, which contains  some void /alternates activities. Complete analysis of manpower and material as per current Market rates.

Budget is bigger evaluation, consisting; cost controlling based on estimation along with margin to withdraw or add new but compulsory activity.

Kalaiyarasan Sivalingam
من قبل Kalaiyarasan Sivalingam , Senior Estimator , JH Construction WLL

Budget:

Budget is a Planned allocation of resources.

i.e Planned Cost - Quantity x unit Cost. 

Estimate:

To analysis and calculation of Unit Cost is called Estimation.

 

Amrutha Raj Makkalikkal
من قبل Amrutha Raj Makkalikkal , Safety Engineer , Quality Engineering Pvt Ltd

  • An estimate comes first and is generally a broad, big picture total sum used in cost/benefit analysis and strategic decision making prior to committing to a course of action.
  • budget is developed after the decision to commit is made and is generally far more detailed, broken into time periods and used to empower, control and account for operational decisions made during the actual implementation of the strategic decision.

المزيد من الأسئلة المماثلة