ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

On average 60% of the project fail (as per multiple surveys & studies). Which of the following variable/variables in your opinion is the main cause?

1. Costs

2.Timescales

3.Quality

4.Scope

user-image
تم إضافة السؤال من قبل Tashfeen Ali Zahid , Engineering Manager , Mezzan Holding
تاريخ النشر: 2015/08/21
Prashant shekhar
من قبل Prashant shekhar

There are various reason behind these incidents.In above4 options first should b Quality .Quality matters alot if you wants a good result in construction field.Second the timescale is the another thing which affects the projects.While achieving the target in a limited time is a difficult task and sometime it affect the project.

المزيد من الأسئلة المماثلة