What is the future of coal fired power plants?

The third world is shifting on coal based technologies so what will be the out come

user-image
تم إضافة السؤال من قبل Adnan Ahmad , Senior Electrical Engineer , Engro Polymer and Chemicals ( Petrochemical Plant)
تاريخ النشر: 2015/11/05
Adnan Ahmad
من قبل Adnan Ahmad , Senior Electrical Engineer , Engro Polymer and Chemicals ( Petrochemical Plant)

The Future of Coal Power plant is Bright however it will increase the pollution. The Coal power Plants will help to tap the coal reservoirs of Thar. 

Imtiaz Ali
من قبل Imtiaz Ali , protection engineer , ACET SOLUTIONS

it's very bright specially in Pakistan, however it do have pollution problem.

Muzzammil Baloch
من قبل Muzzammil Baloch , Electrical Engineer , Albario Engineering Pvt. Limited.

Because of the easiest and inexpensive production of electricity the coal fired power plants are very important and future is bright.Many people think about pollution but by using electrostatic presentations the air pollution could be minimized

Umer Khayam
من قبل Umer Khayam , BSS Engineer , ZTE (Pvt) ltd

Easy way to generate power..but i creat pollution in atmosphere.its future is not good

Muhammad Usman
من قبل Muhammad Usman , Assistant Manager Operations , Lahore Electric Supply Company

I am sorry I just recently completed my Electical Engineering degree and I am not a professional so, i have no idea about your question.

Adnan Khan
من قبل Adnan Khan

Pakistan needs a score of coal-based power projects to bridge the widening gap between electricity demand and supply, said an energy expert. The country produces 16,000 megawatts of electricity and local demand variably stands at around 22,000MW. Chaudhry Abdul Qayyum, who is spearheading a key coal mining project in Thar district of Sindh, said China produces more than two-third of its electricity from coal, which cost-effectively fulfills the energy requirements of the second biggest economy of the world.

Salman Ali
من قبل Salman Ali

Coal Power Plants is the future of energy starved Pakistan. It will help to reduce the energy problems on short term basics. The Coal power projects will inline soon.

محي الدين الرضا
من قبل محي الدين الرضا , Maintenance Manager , CWC CO

futer

0

Resume

Electro Mechanical ( PROJECTS MANAGER) Operation &Maintenance in Saad hospital Elkobaer installation oncology building  Saad hospital Elkobaer(work with parsonJeddah branch MANGER  CWC CO working international codes such as (IGBC, NEC, ASHRAE,API,DIN,SAE,IBC.

NAME

Mohey Eldeen Nasr Mohamed Elreda

DATE& PLACE OF BIRTH

JAN, 1967     EGYPT

Nationality

EGYPTIAN

E.mail           

University

Faculty Of Engineering Shoubra , Cairo , Zigzags University  Year May 1991 Languages: Speak &, Write English  very GOOD(K.S.A deriving license)

Address &Tel

32 abdelazizst.elzehoerBenha .13111 Egypt

 

Experience

CWC CO.

PROJECT MANGER SWD  FEB 2009-2016

PARSONS LTD OR consult  JEDDAH BRANCH & PRV PROJECT WETH NWC CO. storm water O&M JEDDAH  

 Project  Manager Of  Water O&M (Well Born –SupmerisaBell Pumps -R.O Plant-Booster Pumps- Electrical Control Of Pumps -Generator-CCP-Valves –Net Work,  fire alarm ,HVAC

FEB2007–25 April 2009      SAAD TRADING &CONTRACTING                                                          K.S.A

 MAINTENANCE  Manager

Engineer Exp In Design And Insulation oncology building in Saad hospital Elkobaer& ALL MECHANICAL Work.PLUMBER,R.O,FIRE SYESTEM,HVACELECTERICAL WORK

PLANT Manager OF Power Generation Plant O&M Cummins K38 Pccp20* 01 M .W Plant 20 M .W MAINTENANCE (OVER HAULING)

SEPTEMBER2004–OCT2005             ELKOHRAYEF O&M     K.S.A 

Project  Manager Of  Water Project haferalbaten City O&M (Well Born –SupmerisaBell Pumps -R.O Plant-Booster Pumps- Electrical Control Of Pumps -Generator-CCP-Valves –Net Work   LOW SPEEDS 720 RPM& CATERPILLAR 3512, 3508, and 3412. MAINTENANCE (OVER HAULING),WELL PUMP, BOOSTER PUMP, DP PUMP HVAC, Plumber fire alarm

SEPTEMBER2001–SEPTEMBER 2004          MINISTRY OF DEFENSE K.S.A       

Project  Manager Of  Water Project RAFHA IRAQI REFUGE CAMP  O&M (WELL BORN –SUPMERISABELL PUMPS -R.O PLANT-Booster Pumps- Electrical Control Of Pumps -Generator-CCP-Valves –Net Work   LOW SPEEDS 720 RPM& CATERPILLAR 3512, 3508, and 3412. MAINTENANCE (OVER HAULING),WELL PUMP, BOOSTER PUMP, DP PUMP

OCTOBER 1999- SEPT.2001          MINISTRY OF ELECTRICITY & ENERGY            EGYPT

NOVEMBER2005-FEB2007

DIRECTOR OF TECHNICAL WORK SHOP

OPERATION AND MAINTENANCE OF POWER ,HVAC, Plumber GENERATION (DIESEL ENGINE DUTEZ & BOX)fire alarm

MARCH 1995– OCTOBER 1999     MINISTRY OF ELECTRICITY & ENERGY                      EGYPT

OPERATION AND MAINTENANCE OF DIESEL ENGINE GENERATOR VOLVO, DUTEZ DIESEL HELWAN.

July 1993- March 1995   East Delta Of Bus For Transport Egypt

Director of  technical work shop

Operation and maintenance Of BUS   (Diesel Engine &Gearbox)  ………..                 (Type M.A.N & MERCEDES & SCANIA)  (over Hauling of  Engine &Gear Box)

Education

B.Sc.  Mech. power engineer , Zigzage University Cairo       (5years)               EGYPT

Primary To Secondary School                 Egyptian School ,  (12YEARS)          EGYPT

I have advantage in electrical work and degree  from Cairo university in how to use capacitor in Power system  &earthling 

SINCERELY YOURS

 ENG.MOHY ELDE. NASER MOH. EL REDA

MOBILE  

00201020522499

 very good

 

nadim akhter
من قبل nadim akhter , Business engineer , Arabi company w.l.l

it will reduce to generate power considering the pollution and shortage of coal