أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
a) Both a job order and a process cost system track
the same three manufacturing cost elements—
direct materials, direct labor, and manufacturing
overhead.
b) A job order cost system uses only one work in
process account, whereas a process cost system
uses multiple work in process accounts.
c) Manufacturing costs are accumulated the same
way in a job order and in a process cost system.
d) Manufacturing costs are assigned the same way
in a job order and in a process cost system.
i think D is correct answer
Manufacturing costs are accumulated the same
way in a job order and in a process cost system.