How KPI can be assigned for each work ? can anyone explain the process.

user-image
تم إضافة السؤال من قبل Syed Enam Ahmad , Warehouse Manager , Hot Hed MIddle east oil field Supplies
تاريخ النشر: 2016/02/08
Ahmed Abbas
من قبل Ahmed Abbas , Human Resources Manager , Egyptian Saudi Insurance House – Salama:

1. analyze work processes to identify deliverables ,  Supplier, Input, Tools and techniques, output, and customer of each step.

2. Identify stakeholders, and requirements of each step.

3. Identify and categorize critical points (critical to quality, critical to cost, etc.) , constrains, and required controls.

4. set required KPIs for each deliverable which should be SMART (Specific, ,measurable, Achievable, Realistic, and timed).

5. assign wight for each indicator.