1. Using well systematic system.
2. Put extra pressure to worker.
3. Indicate minimum productivity target to the staff.
4. Hire experience with good educated worker.
5. non of above.
My answer is Using well systematic system.
1 & 4. but basically we must understand the process, materials, time, manpower requirements. this is classic example of lean manufacturing based management.
Create standard work, identify waste from the process (there are 7 types of waste in any manufacturing / service industry prioress) apply lean six sigma or Kaizen approach and fix the gaps for most productive process on sustainable basis.
USING WELL SYSTEMATIC SYSTEM