أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
There are basically six parts to any effective Feasibility Study:
1. The Project Scope which is used to define the business problem and/or opportunity to be addressed. The old adage, "The problem well stated is half solved," is very apropos. The scope should be definitive and to the point; rambling narrative serves no purpose and can actually confuse project participants. It is also necessary to define the parts of the business affected either directly or indirectly, including project participants and end-user areas affected by the project. The project sponsor should be identified, particularly if he/she is footing the bill.
I have seen too many projects in the corporate world started without a well defined project scope. Consequently, projects have wandered in and out of their boundaries causing them to produce either far too much or far too little than what is truly needed.
2. The Current Analysis is used to define and understand the current method of implementation, such as a system, a product, etc. From this analysis, it is not uncommon to discover there is actually nothing wrong with the current system or product other than some misunderstandings regarding it or perhaps it needs some simple modifications as opposed to a major overhaul. Also, the strengths and weaknesses of the current approach are identified (pros and cons). In addition, there may very well be elements of the current system or product that may be used in its successor thus saving time and money later on. Without such analysis, this may never be discovered.
Analysts are cautioned to avoid the temptation to stop and correct any problems encountered in the current system at this time. Simply document your findings instead, otherwise you will spend more time unnecessarily in this stage (aka "Analysis Paralysis").
3. Requirements and how requirements are defined depends on the object of the project's attention. For example, how requirements are specified for a product are substantially different than requirements for an edifice, a bridge, or an information system. Each exhibits totally different properties and, as such, are defined differently. How you define requirements for software is also substantially different than how you define them for systems.
4. The Approach represents the recommended solution or course of action to satisfy the requirements. Here, various alternatives are considered along with an explanation as to why the preferred solution was selected. In terms of design related projects, it is here where whole rough designs (e.g., "renderings") are developed in order to determine viability. It is also at this point where the use of existing structures and commercial alternatives are considered (e.g., "build versus buy" decisions). The overriding considerations though are:
A thorough analysis here is needed in order to perform the next step…
5. Evaluation examines the cost effectiveness of the approach selected. This begins with an analysis of the estimated total cost of the project. In addition to the recommended solution, other alternatives are estimated in order to offer an economic comparison. For development projects, an estimate of labour and out-of-pocket expenses is assembled along with a project schedule showing the project path and start-and-end dates.
After the total cost of the project has been calculated, a cost and evaluation summary is prepared which includes such things as a cost/benefit analysis, return on investment, etc.
6. Review that all of the preceding elements are then assembled into a Feasibility Study and a formal review is conducted with all parties involved. The review serves two purposes: to substantiate the thoroughness and accuracy of the Feasibility Study, and to make a project decision; either approve it, reject it, or ask that it be revised before making a final decision. If approved, it is very important that all parties sign the document which expresses their acceptance and commitment to it; it may be a seemingly small gesture, but signatures carry a lot of weight later on as the project progresses. If the Feasibility Study is rejected, the reasons for its rejection should be explained and attached to the document.
ConclusionIt should be remembered that a Feasibility Study is more of a way of thinking as opposed to a bureaucratic process. For example, what I have just described is essentially the same process we all follow when purchasing an car or a home. As the scope of the project grows, it becomes more important to document the Feasibility Study particularly if large amounts of money are involved and/or the criticality of delivery. Not only should the Feasibility Study contain sufficient detail to carry on to the next succeeding phase in the project, but it should also be used for comparative analysis when preparing the final Project Audit which analyses what was delivered versus what was proposed in the Feasibility Study.
1. Strength of the Business Idea
§ Extent to which the idea takes advantage of an environmental trend, Solves a problem, addresses and unfilled gap in the market place;
§ Timeliness of entry to the market
§ Extent to which the idea adds value to its buyer or end user
§ Extent to which the customer is satisfied by competing products already available.
2. Industry-Related issues.
Industries that are growing, are not crowded, and are in the emergence or growth stages of their life cycles are more receptive to new entrants than industries with the opposite characteristics. An important caveat to this set of heuristics is the target market that a new firm selects. There are markets within older, crowded, slow-growth industries that defy the industry’s norms and provide attractive opportunities for new firms. Studying industry related issues should be based upon:
3. Market &Customer Related issues
ü Identify an emerging or underserved target market within a larger market
ü Barriers to entry
ü Purchasing power of customers
ü Ease of making customers aware of a new product or service
ü Growth potential of a target market
4. Founder (s) related issues:
ü Self-assessment of founders: Be honest and fair
ü Strength of the founding team :( Investors would rather invest in a strong founding team with a weak product idea than a weak founding team with a strong product idea.
5. Financial Issues
§ Initial capital Investment (Magnitude of the investment)
§ Number of revenue drivers (Ways in which the company makes money)
§ Financial Performance of Similar Businesses
§ Ability to fund initial product or service development
When a business idea is deemed unworkable, it should be dropped or rethought; if it is rethought and slightly a different version of the original idea emerges, the new idea should be subjected to the same level of feasibility as the original idea.