أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
It is to confirm that the piles would bear the load they are designed to bear (structure that would be built on these piles) for the time period they are designed to bear the load for.
I dont know the answer of this quistion
piles load test ( double of design load) applayed for non working pile to confirm that the bearing capacity of the pile is more save than design load.
Agree with expertsThank you
thanks for invite
waiting for true answers
Thank you for the invitation ............ and apologized for the answer and was awaiting an answer specialists
Experts are waiting for an answer .............. Thanks for the invite
Purpose of pile load test : can plot settlement against load.
iapologize for the answer and thanks
ultrasonography (kidneys-ureters-urinary bladder) and (prostate in male), serum urea, creatinine, calcium, total protein and albumen, urine routine analysis, 24 hour urine for proteinurea and creatinine clearace.