أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
Duration of the project start and the market status of the material which we are going to purchase, wether it is in demand or not, then the requirment status of the project accourding to this we can go for whole saler or the manufacturer.
The delivery time and the price for the materials ...
we should know the budget of the project, we should know what material are easily available at the area of the site in case of a remote area, and most importantly how much time it needs to get delivered at site. All the things should be kept in mind at the time of the startup.
Project cost & timly delivery
The time of delivery should be known along with the budget cost for the material to be procured.