What are all the steps involved in making a car in the factory?

user-image
تم إضافة السؤال من قبل Sathish Prabhu.V , Manager - Operations & Process Improvement , Revolution Valves
تاريخ النشر: 2016/04/23
vidya sagar burra
من قبل vidya sagar burra , Assistant Manager SCM , Gati Kintetsu Express Private Limited

I. Body Shop

2. finished subassemblies are assembled and added to the floor pan and motor compartment.

3. at this point you have the rough shape of a car, but still lack the external body panels that make it look like the final product, lack a roof, and have none of the swing metal parts: doors, hood, deck lid (what you call a trunk/ boot in an automotive factory)

4. In one of the more complex operations in the body shop the body sides are placed onto the vehicle.  This is typically the largest single piece of sheet metal used in a vehicle.  Here's an example of one:

5. Roof time. 

6. Swing metal time.  

7. Hoods and deck-lids are placed in a similar manner to doors.  

8. At this point the BIW looks like a car without wheels, a chassis, a motor, or an interior.  But it's the right shape. Before moving on there's a final section of the production line called "body finishing".  Imagine a tunnel of fluorescent light fixtures with cars running down its center and people on both side of the assembly line at 20' intervals.  The purpose is to identify and fix any problems or defects that would show up once painted.  Workers sand and smooth the body panels to ensure no problems occur once painted.  It's far easier to fix things at this point then to remove paint.

9. Transfer to paint shop. 

georgei assi
من قبل georgei assi , مدير حسابات , المجموعة السورية

Thanks for the invite apologized for not answering specialist

د Waleed
من قبل د Waleed , Management - Leadership-Business Administration-HR&Training-Customer Service/Retention -Call Center , Multi Companies Categories: Auditing -Trade -Customer service -HR-IT&Internet -Training&Consultation

In addition to r. Viday's answer I would like to summarize these steps in :

1. Designing and planning

2. Testing and consulting

3. Executing and manufactoring

4. Testing

5. Launching

 

Thank You

dalal alharbi
من قبل dalal alharbi

I apologize for the answer, I leave the answer to experts specialists in this field, this is not my area.

Mushreq Abdulmajeed
من قبل Mushreq Abdulmajeed , Senior Project Supervisor , Lagoon Spring Company

I apologize this is not my experts

Ahmed Mohamed Ayesh Sarkhi
من قبل Ahmed Mohamed Ayesh Sarkhi , Shared Services Supervisor , Saudi Musheera Co. Ltd.

wait more details from our experts

 