Kitting refers to: Select one:

a. Collecting items received from different suppliers and re-packing them as per a production bill of materialb. Collecting items received from different suppliers and dispatching them to end-consumersc. Receiving items from production in the form of kits and preparing them for inspectiond. None of the above

user-image
تم إضافة السؤال من قبل Wasi Rahman Sheikh , Warehouse Supervisor , AL MUTLAQ FURNITURE MFG
تاريخ النشر: 2016/04/25
Sathish Prabhu.V
من قبل Sathish Prabhu.V , Manager - Operations & Process Improvement , Revolution Valves

Eventhough A and B are close answers, I would go with option A, because it explains the correct method of collecting related items from different suppliers and them assembling as per Production bill of order.

Nadeem Asghar
من قبل Nadeem Asghar , Supply Chain Consultant/Trainer , Independent Practitioner

I think A to be the right choice.

ghazi Almahadeen
من قبل ghazi Almahadeen , Project Facilitator , Jordan River Foundation

Thanks for the invite ............................ c

Ramzi SAMRI
من قبل Ramzi SAMRI , Industrial engineer , Institut für Betriebliche Bildungsforschung Berlin (IBBF)

As I know, I choose the option A. This is the appropriate answer.

Thks

Ahmed Mohamed Ayesh Sarkhi
من قبل Ahmed Mohamed Ayesh Sarkhi , Shared Services Supervisor , Saudi Musheera Co. Ltd.

 

Option " C "                                  .

مستخدم محذوف‎
من قبل مستخدم محذوف‎

b. Collecting items received from different suppliers and dispatching them to end-consumers

Saiyid Maududi-Oracle Applications Consultant
من قبل Saiyid Maududi-Oracle Applications Consultant , Entrerprise Architect , US Technomatrix, Inc

Hello Team,

Process in which individually separate but related items are grouped, packaged, and supplied together as one unit. For example, in ordering a PC online, a customer may select memory, drives, peripherals, and software from several alternatives. The supplier then creates a customized kit that is assembled and shipped as one unit.

Regards,

 

Saiyid

dalal alharbi
من قبل dalal alharbi

I apologize for the answer I leave the answer to the experts, specialists in this field that's not my specialty field

Ghada Eweda
من قبل Ghada Eweda , Medical sales hospital representative , Pfizer pharmaceutical Plc.

Agree with expert answers.Thanks

MADAN MOHAN GAJULA
من قبل MADAN MOHAN GAJULA , Material Coordinator , Sadara Chemical Company

c. Receiving items from production in the form of kits and preparing them for inspection