ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

How is Planning at Container Terminal?

user-image
تم إضافة السؤال من قبل مستخدم محذوف‎
تاريخ النشر: 2013/09/21
ALI HASAN ALI SHAWESH SHAWESH
من قبل ALI HASAN ALI SHAWESH SHAWESH , • Documentation Executive at Middle East Shipping Co.(As Agent of Coscon,WEC,SCI lines) , International Shipping Co. Wilhelmsen Ships Service and Middle east shipping co. (hasco ).

As per shipping co. and as per20'ft  and40'ft every area.

مستخدم محذوف‎
من قبل مستخدم محذوف‎

A container port must be planned to satisfy prompt accommodation of

ships with minimum waiting time in port, and with maximum use of berth

facilities. Somewhere between these opposing objectives each container

port must reach a compromise, the number of berths which will achieve the

most economical transfer of cargo between ships and shore.

Computational experiments were conducted to evaluate the performance of

the developed models using real data collected from the Korean container

terminals. The effects of various practical considerations on the

performance of the suggested planning process are tested numerically and

by using a simulation study.

 

alaa houssain
من قبل alaa houssain , customer service supervisor , coscodom maritime

stowage plan and load list for containers are care of the role and the facilities between the port mangement and the agent for example the free pool for free stowage container in the terminal that mean we handle our load and discharge container with low cost as we can and try to avoid any restow from vessel bad handling and follow the old full container stay in terminal  to bush the consignee to recieve thier cargo or re export  again  and else

 

المزيد من الأسئلة المماثلة