ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

Value engineering is used when the project team wants to?

a. Deliver the highest value to the customer with each deliverable

b. Evaluate multiple project solutions that will deliver the highest value to the customer

c. Calculate the cost of doing the work versus the value that is delivered

d. Reduce project costs without sacrificing scope

user-image
تم إضافة السؤال من قبل Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.
تاريخ النشر: 2016/05/18
Mohamed Helal
من قبل Mohamed Helal , Project Manager , GROUP CONSULT INTERNATIONAL

d. Reduce project costs without sacrificing scope

Muhammad Farooq
من قبل Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.

D – Value engineering is a technique that is used to look for ways of reducing costs without sacrificing features or scope

Oussama BEN SMIDA, PMP
من قبل Oussama BEN SMIDA, PMP , Senior Construction Manager , Havelock One Interiors

I think that Option 04 is the best answer 

Eng Ahmed Elsharkawy
من قبل Eng Ahmed Elsharkawy , Civil Engineering Project Manager , Altwijry office

thanks for invition ,,,,,,,,,, my choice is option D

مستخدم محذوف‎
من قبل مستخدم محذوف‎

a. Deliver the highest value to the customer with each deliverable

sardar mardookhy
من قبل sardar mardookhy , PMP certified Project manager , MCCI

agreed with answers

thanks.,..................

Adel Gad Eltouni
من قبل Adel Gad Eltouni , Precast Manager , AlBawani Ltd. Co

minmize the cost within saftey conditions thru design parameters,design reviewing and project specs to enlarge the profit.

Ghada Eweda
من قبل Ghada Eweda , Medical sales hospital representative , Pfizer pharmaceutical Plc.

The answer is already given by experts. Thanks

المزيد من الأسئلة المماثلة