ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

What is the key responsibilities of a LEED GA Engineer in a Project ?

What is the key responsibilities of a LEED GA Engineer in a Project 

user-image
تم إضافة السؤال من قبل مستخدم محذوف‎
تاريخ النشر: 2016/05/21
Khurshid Siddiqui
من قبل Khurshid Siddiqui , Lead HVAC Engineer , Wood Group

Gentleman, I found a good reference from USGBC, I hope this will explain the topic very good:

  • Communicate broad and basic green building concepts to team or colleagues 

  • Research and create a library of sustainable building materials 

  • Assist others with sustainability goals 

  • Create project profiles/case studies/press releases

  • Serve as a green advocate to clients, team members and the general public (e.g. why green building) 

  • Stay current on any updates to LEED and green strategies in general 

  • Navigate LEED Online 

  • Assist project leaders with LEED correspondence to project team members (consultants, contractors, owner, etc.) 

  • Assist in managing the documentation process

  • Assist in managing the LEED certification timeline

Bharti Vaishya
من قبل Bharti Vaishya , Senior Project Engineer , Delphi Thermal Systems

He can provide support to the team in terms of helping them complete documentation and making sure that all materials documented comply with LEED requirements.

مستخدم محذوف‎
من قبل مستخدم محذوف‎

Thank you for the invitation, I leave answer to experts

dalal alharbi
من قبل dalal alharbi

I apologize for the answer , I leave the answer to the specialists the experts in this the field , that's not  The area of my specialty.

syed tahmul ullah hussaini
من قبل syed tahmul ullah hussaini , SENIOR MECHANICAL ENGINEER , SAUDI BINLADIN GROUP

TO VERIFY THE INNOVATION IN DESIGN .

-FACILITATE  THE IMPLEMENTATION OF  EFFICIENT WATER AND ENERGY MANAGEMENT PLAN BY PARTICIPATING IN ANALYSING  METHODS FOR LIMITING WATER AND ENERGY CONSUMPTION

- TO VERIFY  SUSTAINABLE MATERIAL USED  AND  THEIR STORAGE ON PROJECTS

-TO HAVE A CHECK ON ACTIVITIES OF CONSTRUCTION WHICH CAUSES  POLLUTION TO AIR AND WATER AND PRODUCTION OF TOXIC GASES.

-TO ENSURE  IMPLEMENTATION  OF A GOOD WASTE MANAGEMENT PLAN

-MAINTAINING  SUSTAINABLE  INDOOR  ENVIRONMENT

 

-ENCOURAGE THE PROJECT FOR RECEIVING  THE GREEN BUILDING CREDITS.

peer mohideen.s sheik abdul khadar .k
من قبل peer mohideen.s sheik abdul khadar .k , Site engineer , Eta Mne Division

Follow International standard to select all equipment which should not effect to environmental and human beings like using chemicals etc

adadi ABDERRAHMAN
من قبل adadi ABDERRAHMAN , قائد الفريق , STE SOTA COGENORD SARL

Thank you for the invitation Leave the answer for the professionals in this area

Yahia mohamed  Amen Gad
من قبل Yahia mohamed Amen Gad , إدارة - مدرب - , سنابل الأجيال للتعليم والتدريب

Thank you for the invitation and I agree with Professor Khurshid

مها شرف
من قبل مها شرف , معلمة لغة عربية , وزارة التربية السورية

I agree with experts answer. Thanks for the invitation. .

pradeep KUZHIYANJAL
من قبل pradeep KUZHIYANJAL , Senior Project Engineer , LAITH ELECTROMECHANICAL WORKS LLC, ABU DHABI,U.A.E

IMPROVE EFFICIENCY AND COMPLY WITH LEED REQUIREMNETS 

Sherif Mohammed Ibrahim
من قبل Sherif Mohammed Ibrahim , Senior Mechanical Technical engineer , Al-Latifia Trading & Contracting Company

Definitely i agree with Mr Khurshid answer

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟