أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
analysis and determined that the CPI index is1. and SPI index is1.. Specifically, your project is coming in ahead of schedule and under budget. However, one of your structural engineers informs that he is afraid that the welding does NOT meet quality standards. Unfortunately, sub-par quality in the welds could reduce the stability
of the bridge, especially is the earthquake happens. Hence, you are working with the
quality assurance department to verify that whether the project will satisfy the necessary quality standards. All of the following are required in order to start this process EXCEPT:
A. Work performance information
B. Quality control measurements
C. Quality metrics
D. Recommended corrective actions
Agree with experts answers . thank you
My oppinion is that the right answer is:
D. Recommended corrective actions
To verify the project against quality standards, I don't think corrective actions are required, hence option D should be the right answer
Correct answer is
D. Recommended corrective actions
Thank you for inviting for answer _--- I will be wait for more experts answer
Option A seems closest answer.
My name is Ashley Vivian, Am here to share a testimony on how Dr Raypower helped me. After a 1/5 year relationship with my boyfriend, he changed suddenly and stopped contacting me regularly, he would come up with excuses of not seeing me all the time. He stopped answering my calls and my sms and he stopped seeing me regularly. I then started catching him with different girls several times but every time he would say that he loved me and that he needed some time to think about our relationship. But I couldn't stop thinking about him so I decided to go online and I saw so many good talks about this spell caster called Dr Raypower and I contacted him and explained my problems to him. He cast a love spell for me which I use and after 24 hours,my boyfriend came back to me and started contacting me regularly and we moved in together after a few months and he was more open to me than before and he started spending more time with me than his friends. We eventually got married and we have been married happily for 3 years with a son. Ever since Dr Raypower helped me, my partner is very stable, faithful and closer to me than before. You can also contact this spell caster and get your relationship fixed Email: urgentspellcast@gmail.com or see more reviews about him on his website: https://urgentspellcast.wordpress.com WhatsApp: +1 (209) 783-8804
The answer is C quality matrix
thanks for invition ,,,,,,,,,, my choice is option D
I think D is a suitable answer..
thanks
هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟