ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

Is it a good aset management and preventive maintenance in electrical equipment and system have been implemented in your company?

user-image
تم إضافة السؤال من قبل Nazeli MN , Assistant Engineer/Technical Executive , Radicare(M) Sdn. Bhd.
تاريخ النشر: 2013/09/22
Hammad Ur Rehman Khan
من قبل Hammad Ur Rehman Khan , Shift Control Engineer , TNB Remaco Pakistan Pvt. Ltd. (A wholly Owned Subsidiary of Tenaga Nasional Berhad, Malaysia)

yes, we have asset management and PM schedules  modules for all the systems and Units in our IBM MAXIMO. It automatically gives the alert for the minimum and maximum stock levels and similarly PM of various systems automatically generates Work orders on the scheduled dates (Monthly,weekly, yearly, whatever the frequency is set)

المزيد من الأسئلة المماثلة