ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

What is the importance of work break down in construction project?

user-image
تم إضافة السؤال من قبل Hossam hemdan abou-elhassan , construction civil engineer , ROAYA GROUP FOR DEVELOPMENT AND PROGECTS MANAGMENT
تاريخ النشر: 2016/06/26
Imran Ahmed
من قبل Imran Ahmed , Manager-Planning & Delay Analyst , Nesma United Industries (NUI) Saudi Arabia

Work Breakdown Structure is deliverable oriented hierarchical decomposition of the work to be executed by the project team

The WBS visually defines the scope into manageable chunks that a project team can understand, as each level of the work breakdown structure provides further definition and detail.

Ramy Saleh Hanna
من قبل Ramy Saleh Hanna , Construction Manager , ELEVATE CONSTRUCTION COMPANY

A work breakdown structure lets project managers plan their work more efficiently. A project is characterized by time-limited activities and is assigned fixed time frames and costs. When it is finished, a project must fulfill the stakeholder needs it was designed to address. The project management has to plan for the schedule, the fixed costs and the functional completeness of the project and assign responsibilities. The WBS helps make this planning consistent and provides for effective project execution.

chinmay kaldate
من قبل chinmay kaldate

WBS is important to track the progress in the project schedule. 

BIJU GOPALAKRISHNAN
من قبل BIJU GOPALAKRISHNAN , Senior Budget and Planning Engineer , Worleyparsons - Saudi Arabia

WBS reflects BOQ summary items. So the WBS can be used to track BOQ for physical progress and cost.

Eng Ahmed Elsharkawy
من قبل Eng Ahmed Elsharkawy , Civil Engineering Project Manager , Altwijry office

thanks for invition ,,,,,,,,,, i agree with experts answers

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟