project mangaer for electrical work and electromechanical corrdinate, Desgn & F.S
My skills and previous experience have ensured that I have developed strong project management skills including clear communication and a problem solving approach to issues.
I can accurately capture the requirements of both the customer and wider project and provide a reliable and measurable plan with clear deliverables. This is further enhanced by a positive and pragmatic approach to communication through the entire project life cycle.
I have industrial training in Alain distribution company (utility) for over3 month during that time we have work in different department such as cable, LV and HV (33 KV,11 KV), Maintenance and protection .
1)- Project budget:95 million Egyptian pound.
Project name: elzahra (13,3) navigator company MV network in east of owaynat
-Title: senior (c) design & site engineer.
Manger for: team of (39) as a senior site engineer. direct manger of6 engineers (civil-electrical) & as indirect manger for technicians , workers and equipment drivers,craftmens to establish the infrastructure of 22 k.v -(medium voltage) network.
Job description:
Participate in creation the design and excution of medium voltage24 KV network as senior electrical design engineer . and doing the maintenance work procedures schedule for older network with brand knowledge in medium voltage system
More description:
The design job contains:
Designing work
(i)-Surveying work to specify the poles - (galvanized steel poles) - location and routing overhead transmission line paths .
(ii)-participate in calculating : (maximum sag – clearance –spacing-design tensions-wind load –choosing poles categories) calculations.
(iii)-participate in (load estimation – specifying the required M.V & L.V cables and wiring size for load feedings-voltage drop and its effect calculations-power factor improving calculations-short circuit current calculation for all project circuits-protection devices selection for all project (relays-circuit breakers-fuses)
(iv)-transformer rating specifications for150 transformers
(v)-earthing protection calculations.(rods-plates-non insulated cables...etc)
(vi)- specifying surge arrestors installation techniques and its rates.
(vii)- distributer selection and the required protection strategies for the network.
Execution works
(viii)-installation of the galvanized steel poles with all of its categories: (9/12) , (10/12),(11/12)...etc & O.V TL 120 KM pulling over its dielectrics.
(ix)-installation of air disconnecting switches (with and without ) fuses. In the poles
(x)- pulling 25 KM of M.V underground cables (3*70) XLPE and L.V cables (3*240+120) XLPE for both medium voltage and low voltage networks.
(xi)- installing (300,500) KVA transformers and checking all transformer component (LV, MV, TR) sides. and its kiosks.
(xii)- installation of power factor improvement component ( No load capacitors & capacitor banks)
(xiii)-installation of earthing grid or network for all required components (poles , transformers , distributers, loads –induction motors).
(xiiii)-installation of project24 KV distributer by all its component (control and power circuits).
.(Elsewedy helal –energya p.t.s- company).
***************************************************
(1)- Project budget:45 million Egyptian pound.
Project name: East of owaynat district (5).
-Title: electrical site engineer.
Manger for: team of (32) as a electrical site engineer. direct manger of direct manger for technicians , workers and equipment drivers,craftmens to establish the infrastructure of 22 k.v -(medium voltage) network.
Job description:
Participate in installation of medium voltage24 KV network as electrical site engineer .
More description:
The site work containing:
(i)-installation of the galvanized steel poles with all of its categories: (9/12) , (10/12),(11/12)...etc & O.V TL 120 KM pulling over its dielectrics.
(ii)-installation of air disconnecting switches (with and without ) fuses. In the poles
(iii)- pulling 25 KM of M.V underground cables (3*70) XLPE and L.V cables (3*240+120) XLPE for both medium voltage and low voltage networks.
(iv)- installing (300,500) KVA transformers and checking all transformer component (LV, MV, TR) sides. and its kiosks.
(v)- installation of power factor improvement component ( No load capacitors & capacitor banks)
(vi)-installation of earthing grid or network for all required components (poles , transformers , distributers, loads –induction motors).
(vii)-installation of project24 KV distributer by all its component (control and power circuits).
.(Elsewedy helal –energya p.t.s- company).
****************************************************************************
1)- Project budget:45 million Egyptian pound.
Project name: East of owaynat district (east of10 an21).
-Title: electrical maintanance engineer.
Manger for: team of (16) as a electrical maintanance engineer. direct manger of technicians , workers and equipment drivers,craftmens to maintain and scheduling damages the infrastructure of 24k.v -(medium voltage) network.
Job description:
Participate in doing maintenance works of medium voltage24 KV network as electrical maintanance engineer .
More description:
The maintanance work containing:
(i)-fixing of the galvanized steel poles with all of its categories: (9/12) , (10/12),(11/12)...etc. by substitution its reinforced concrete bases and the various civil techniques and the antirust substances.
(ii)-fixing of air disconnecting switches (with and without ) fuses. In the poles (moving transmitter part ,contact points,handle....etc)
(iii)- inspecting20 KM of M.V underground cables (3*70) XLPE and L.V cables (3*240+120) XLPE for both medium voltage and low voltage networks by using insulation tester devices and the other electrical techniques ,replacing joints , termination and lugs.....etc
(iv)- inspecting and fixing (500) KVA transformers and checking all transformer component (LV, MV, TR) sides. and its kiosks. Inspecting oil level , insulation of winding ,.......etc
(v)- replacement of power factor improvement component ( No load capacitors & capacitor banks) and its wiring cables.
(vi)-installation of earthing grid or network for all required components (poles , transformers , distributers, loads –induction motors).
(vii)-installation of project24 KV distributer by all its component (control and power circuits).
.(Elsewedy helal –energya p.t.s- company).
***********************************************************************************************************
(5)-Work as a power procurement engineer for .(Elsewedy helal –energya p.t.s- company).
****************************************************
(6)- Work for Vodafone by Sub Company before graduation. Only for64 days .and it’s the project time interval.
external courses.
(1st) – project management certification from American chamber of commerce
(2nd )-Management within law course from American chamber of commerce.
(3rd ) Certified Siemens electrical course of (basic of electricity).
(4th )Certified Siemens electrical courses of (motors & control) passed on (Ac-motors) and the rest still running
5th The Don Bosco instillation course
6th The Don Bosco Automaticcontrol circuits course
electro-mechanical engineer with2 years of work experience in construction stream.