أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
by doing welltest and make analysis
we can found well drainage radius froml the welltest interpretation
The Draing radius can be estimated from the pressure Build up analysis
we can define the effective drainage radius during the flow in a bounded reservoir from well testing